Skip links

Projects

What We’ve Accomplished

Based on longtime experience our large internal quality management and assurance department has worked out reliable and proven methods to control the production and ensure that only first-time-perfect products leave our work shop.

This would not be possible without our capable qualified staff that make the production process to the creation of art.

ELECTRICAL & AVIONICS

PRIMARY STRUCTURES

Our extensive experience provides the ability to design and certify systems integrations & instillation or upgrades of numerous electrical and avionics systems on all types of Aircraft’s.

  • IFE- IN FLIGHT ENTERTAINMENT INSTALLATION
  • IFE REMOVAL
  • ELECTRICAL CHANGE
  • USB INSTALLATION
  • ISPSS POWER INSTALLATION
  • ELA -ELECTRICAL LOAD ANALYSIS
  • PROGRAMMING OF ELT
  • ADS-B

MAJOR & MINOR REPAIR

EXTENSIVE EXPERIENCE

Our Design .Airworthiness team has the full capability to carry out extensive repairs to all Primary and secondary structures through both our EASA DOA as well as our  FAA ADO:

  • PRIMARY STRUCTURE SKIN REPAIR
  • NACELLE REPAIR
  • THRUST REVERSER
  • INLET COWLING DE-LAMINATION

CABIN INTERIORS

HIGH STANDARDS

We are able to configure aircraft cabin interiors including:

  • CABIN LAYOUT (LOPA)
  • EMERGENCY EQUIPMENT CHANGES
  • SEAT INSTALLATIONS
  • GALLEY INSTALLATION
  • LAVATORY INSTALLATION
  • CREW REST INSTALLATION
  • MEDICAL LEG -REST INSTALLATIONS
  • CABIN MODIFICATIONS
  • DRESS COVER CHANGES
  • CURTAIN CHANGES
  • CARGO LOADING EQUIPMENT PROTECTION PANEL INSTALLATION
  • CARPET & NTF CHANGES
  • SEAT BELT COLOUR CHANGES
  • GALLEY EQUIPMENT CHANGES
  • MAGAZINE RACK INSTALLATIONS
  • SOAP DISPENSER INSTALLATION
  • PAX DOOR INSULATION BLANKET INSTALLATION
  • EXTERIOR & INTERIOR PLACARD INSTALLATION

FAA SUPPORT

FAST & EFFICIENT

Our FAA DER /DAR over the years have successfully  delivered numerous  of 8110-3 on FAA Type aircraft  as part of the lease return process.